Board of Directors |
Michael Bennett, Director |
|
Dana Quillen, Director |
|
Callie Stuckey, Director |
|
Officers |
Vacant, President |
|
Vacant, Vice President |
|
Dana Quillen, Secretary |
|
Fred Leibrock, Treasurer |
|
Architectural Control Committee (ACC) -
|
- The EAVHOA Covenants state, in short, that all improvements and/or alterations to your dwelling need to be approved
by the ACC prior to commencement. Improvements and alterations include by are not limited to; a fence, a building,
a wall, a storage shed, a cabana, a greenhouse, a playhouse, or pergola. For more information, see section 4.14 of
the EAVHOA Covenants.
- To submit your project for ACC approval, compose a letter to the association president detailing your
proposed improvement or alteration. Include a sketch of the proposed project and a drawing of your lot
showing your house in relation to the proposed project. The letter, including the referenced attachments, can be
submitted to the ACC by
.
- The ACC turn around time is approximately 10 to 14 days.
|
|
|